Saturday, June 14, 2008

Plumbing (Out of) My Depth(s)...

Another burst of activity!
Oh My God! Running (cold) water - in the house!
And it drains out, too.
And dig that science homeroom style faucet...

Water and vent pipes fill the wall between the bathroom and the pantry.

Vent pipes... more to come...
If these windows opened, we'd have to move the pipes. But they don't.

The tub/shower.

1,000 gallon septic tank, ready to install.

Tank in (beneath green covers), and distribution field going in.

Only the tank covers visible now.



Two big loads of gravel, for the distribution field, and the driveway,
and the French Drain on the north side of the house.

The distribution field now invisible!

Gravel over and gravel under 4" leaky pipe.

French Drain,
carrying water from the north side, away from the house.

Thursday, June 5, 2008

Through the wall!

All kinds of progress:

The roof style is called "Brai." Above is the base and galvanized drip-edge.

Cliff Bain, a Brai specialist, uses a torch to heat-seal the tar-based material.

The top layer has sand embedded in it. This matches the existing roof.

The finished roof. We'll be adding flashing and trim under the windows above the roof. The 4 small windows on the newaddition were lifted from the original structure.
The variation of color on the walls will fade as it weathers (I hope).

Bedroom windows. The one new window is on the left.

We've cut the wall openings into the new addition!
Pardon my messy house...

The fridge is temporarily in the corner, actually where the washer/dryer goes. The boards on the floor are the bottoms of the walls:
bathroom left, pantry right.

The plumber is scheduled to appear Monday. He'll also be putting in the septic system. We're approaching the next big round of inspections...